Ferreira do alentejo

Battery Storage

Aura Power are developing a 307MW battery storage system near Ferreira do alentejo. The storage system covers 4 plots of land in a total of 6,9 hectares. The installation is composed of 4 battery units and each unit is made up of 24 and 28 batteries.

Battery storage systems, such as this, play a crucial role in the decarbonisation of our electricity network with much needed increases in renewable energy sources.

Batteries store excess energy at times of low demand i.e. from a solar farm on a sunny day, and discharge the energy back into the grid when it is needed the most.

Latest News

2024

Site selected and land rights agreed

2025

Undertaking a series of environmental surveys to inform our plans

2026

Permitting completion target

2026

Construction to start, if permits acquired

2028

Energisation of the battery storage system once construction is complete

Key Facts & Benefits

Contributes to local and national targets
Local School Visits

Our Proposal

We are currently in the early stages of developing this battery energy storage project. Our proposed layout can be seen to the left and would import and export power from the grid and store it in batteries. As such, it would not result in any emissions during operation. It would act as a ‘balancing service’ for the grid in balancing frequency at times of system stress. In simple terms, battery storage provides a means of allowing electricity from the grid to be imported and stored within the batteries at times of low usage, and exported back into the grid at times of system stress / demand.

The site is located nearby an existing electricity substation, meaning energy stored in the batteries can be released rapidly back into the grid.

Projected Views

Contact Us

Your feedback is very important to us. Please leave a comment and one of our project team will get back to you as soon as possible.